The 2010 Construction of Installation-wide Roads project will remove 175.54 ft2 of pine BA on 8.39 acres. ... The 2010 Repair/ Upgrade Existing Training Area Roads project will have impacts within 51 to 200 feet of two of 10 cavity trees.